Positive Material Identification
On-site alloy verification of piping, fittings and components, confirming that installed material matches the specified grade.
PMI confirms that what was installed is what was specified. Composition is checked in place, which catches the substitution and mixing errors a paper trail alone will not, particularly on small-bore fittings and replacement components fitted under time pressure.
Typical scope: on-site alloy verification of piping, fittings, valves and welds; verification of consumables and weld deposits; sampling regimes agreed against risk; marking of verified items; reporting of non-conforming material against the specification.