Load-out & Roll-on / Roll-off

Load-out of fabricated structures to barge or vessel by crane, skidding or self-propelled transporter, to an agreed load-out procedure.

Load-out is timed against tide and ballast rather than the working day. Quay strength, vessel trim and ballasting are calculated in advance so the transfer happens inside a defined window and the structure never sees an unplanned load.

Typical scope: load-out method statement and procedure; crane, skidding and self-propelled transporter options; quay and grillage capacity assessment; ballast planning and tide window calculation; seafastening design and installation; load-out supervision and completion record.